HUAWEI BTS COMMISSIONING PDF

1. Application Description 1) Service Description The base station commissioning indicates that the users commission and verify the base. OptiX RTN Radio Transmission System. VRC Commissioning and Configuration Guide (Web LCT). Issue, Date, HUAWEI. Huawei DBS Commissioning Procedure Security Level: Huawei DBS Commissioning Procedure (V) HUAWEI Confidential Page1.

Author: Mukinos Gajar
Country: Lithuania
Language: English (Spanish)
Genre: Environment
Published (Last): 25 March 2009
Pages: 72
PDF File Size: 2.47 Mb
ePub File Size: 6.90 Mb
ISBN: 575-7-90527-844-4
Downloads: 4773
Price: Free* [*Free Regsitration Required]
Uploader: Maunos

Set the IP address for laptop.

RTN VRC01 Commissioning and Configuration Guide 02(Web LCT) – Huawei

This report then provides the basis for scheduling activities for commissioning preparation and commissioning activities. Commissioning Preparation In order for commissioning preparation to be considered complete the following must have happened.

The Upgrade NodeB software commissionihg box will not be displayed. Click here to sign up. Make sure the PSC is right in each cell. Alpha Gamma N Beta Once the cell orientation has been verified then call testing can begin. Call P Testing For different base station commissioning scenarios, the following methods commissioning be used: Site Installation Checks Before the engineer begins the commissioning of the base station they will be required to carry out an audit of the installation quality.

Core Network Info Community Members: Once the NodeB has reset the new configuration will take effect. Help Center Find new research papers in: Group Post User Document.

  LOS VIGILANTES DEL FARO CAMILLA LACKBERG PDF

Initiate the internet connection and make sure connection is set up. If the USB Memory stick is detected correctly the following should happen within 20 seconds: The commissioning procedures for different base stations all comnissioning the following aspects: If the RNC engineer is not able to provide the necessary support the local engineer will need to commisxioning Huawei technical support. Click Add and Fill the table.

Testing will differ slightly between S and S sites due to the different in cells present on the site. The base station to be deployed has been configured. If it is not the right version, please do Item 10 Local Commissioning again. The engineer will need to resolve or account for any active alarms on the NodeB with the assistance of the RNC engineers and Huawei technical support.

RTN 950 V100R003C01 Commissioning and Configuration Guide 02(Web LCT)

The following methods can be used for quick commissioning: Use the [Browse] button to set the location of the configuration file NodeBCfg. Application Description 1 Service Description The base station commissioning indicates that the users commission and verify the base station based on design requirements to ensure that the base station can work properly.

Call RNC Engineer to block all cells.

Scope The scope of this document is to give a detail procedure for the commissioning of the Huawei DBS base station. Fixed Network Info Community Members: Telus has some special sites, which are not defined like this, Huawei will provide a list of these kind of sites Site Awareness There are a number of site in Canada that are in remote location that require situational awareness therefore when travelling to and from remote site locations it is important that the engineer is equipped for travel to remote sites Engineers must also be aware that Tower work takes precedent over any other site work; therefore if tower work is in progress then the tower crew is in control of the site.

  KALAGNANAM TELUGU PDF

Make a call and walk around the huxwei, to make sure there is no call drop.

Save it and send all these three files to Huawei. Then double-click Software Update, as before.

Micro Base Station Commissioning Guide

Once the downloading of huswei software and configuration to the DBS begins the following should be occurring: If required the engineer may have to remain off site until tower crews have finished any ongoing operations. Once this is all complete click [Next]. Sub-contractor team got the special USB memory stick with LED available and kept the NodeB software and script with hhuawei correct name, file format in the correct path as following: The following section describes the checks required.

Author: admin